Preferred Option Public Consultation Event is now online
18th December 2023
The materials presented during the Public Consultation Event for the Preferred Option of the Carrickmines Shanganagh River Flood Relief Scheme held the 13th of December 2023 are now available online. In the link above you can find the presentation, questionnaire and advertisement materials.
7th December 2023
Carrickmines Shanganagh River Flood Relief Scheme Newsletter 3 has been published and can be found in the Project Documents section of this website. In it you can find an overview of the scheme, its current status and tasks planned in the near future
Preferred Option Public Consultation Event
6th December 2023
The Public Consultation Event for the Preferred Option of the Carrickmines Shanganagh River Flood Relief Scheme will be held the 13th of December 2023 from 4:30pm to 8:00pm at the Rathmichael Parish National School, Shankill. More details can be found in the link above.
31st August 2022
Carrickmines Shanganagh River Flood Relief Scheme Newsletter 2 has been published and can be found in the Project Documents section of this website. In it you can find an overview of the scheme, its current status and tasks planned in the near future
15th February 2022
DLRCC have recently appointed Murphy Geospatial to undertake ground level surveys at several locations throughout the catchment where flood protection measures may be required. The surveys will provide accurate information on the catchment land features near the proposed measures.
19th May 2021
Carrickmines Shanganagh River Flood Relief Scheme Newsletter 1 has been published and can be found in the Project Documents section of this website. In it you can find an overview of the scheme, its current status and tasks planned in the near future
Channel, Structure and Threshold Survey
29th April 2021
As part of the preliminary project phase for the Carrickmines Shanganagh River Flood Relief Scheme, a channel, structure and threshold survey is being undertaken by Murphy Geospatial from Monday 11th of April.
23rd March 2021
As part of the preliminary project phase for the Carrickmines Shanganagh River Flood Relief Scheme, a flow monitoring survey is being undertaken by Capital Water Systems from Wednesday 3rd of February.